hgprieto

In situ Geophysical Monitoring of Surface Barriers

During the week of July 11 – 14, members of the ALTEMIS team from SRNL and PNNL collaborated with SRNS’s ACP to install an electrical resistivity tomography (ERT) array at the F-Area Hazardous Waste Management Facility (FHWMF) along the cap of F-Area Basin 3.